← VELQANIS / HOME
VELQANIS proprietary screening platform

Water Diagnostic Platform for Mining Industry

Enter representative process-water or process-liquor data to screen scaling mechanisms, estimate antiscalant-free operating risk, evaluate existing dose sufficiency under the VELQANIS projection model, and calculate daily, monthly and annual antiscalant consumption.

CIP / CILMerrill-CroweHeap LeachPOXStripping / ElutionCCD & ThickenersTailings / Reclaim
Important: This tool is designed to help mine-site teams understand their own operating data. Results are preliminary VELQANIS projections and are not a validation, benchmark or performance statement for competitor products.

Report cover information

These details will appear at the top of the A4 technical report and in the VELQANIS evaluation request e-mail.

1. Site, process and sample point

Select the process first. The sample-point menu will adapt to the location that normally drives scaling risk in that circuit.

Sampling protocol & confidence

2. Water / process liquor chemistry

Use the analysis of the selected sample point. Enter values as measured; the model applies the selected concentration/recycle factor separately.

3. Operating data & treatment status

4. Deposit / scale sample analysis (optional XRD / XRF evidence)

If a solid sample was collected from the actual scaling / deposit location and analyzed by XRD or XRF, enter the key results below. This will be used as a supporting evidence layer together with the water-chemistry projection.

Live projection dashboard

Detailed but simplified: the dashboard highlights what matters first, then supports it with charts, indicator tables and consumption projections.

Overall risk0/100
Risk bandLOWOverall screening classification
Dominant mechanism—Most critical current stressor
Data confidenceLowBased on the sample protocol checklist

Risk mechanism profile

Relative intensity of the main fouling / scaling pathways under the selected conditions.

Dose sufficiency gauge

Compares entered current dose versus VELQANIS projected target dose.
Current dose—
Target dose—
Status—
UntreatedBelow targetProjected rangeHigh
Treatment interpretationNo treatment entered.

Deposit / scale sample evidence overlay

Optional XRD/XRF interpretation from the actual scaling point. This supports or challenges the water-chemistry projection.
Deposit driverNot enteredXRD/XRF dominant signal
Evidence strength—based on entered percentages
Model match—water model vs deposit sample
Use in reportOptionalsupporting evidence layer
Deposit sample interpretationEnter XRD/XRF data only if the sample was collected from the actual scaling / deposit point.

Water-stability indicators

LSI—
RSI—
PSI—
LSI vs concentration factorequilibrium line

Antiscalant consumption projection

Daily target—kg/day
Monthly target—kg/30 days
Annual target—kg/year
Logistics—IBC equivalent/year
Projected targetCurrent entered dose

Water-stability and scaling indicators

Index / indicatorProjected valueInterpretation

Deposit sample interpretation

XRD / XRF evidenceResultInterpretation

Antiscalant consumption projection

ScenarioDoseDailyMonthlyAnnual

Recommended next actions

ALSCALE MINE®Primary VELQANIS antiscalant range for mining process circuits.
Scientific logicLSI, RSI, PSI, silica stress, Ca×SO₄ loading and process context are combined.
Target process doseGeneral planning range: 5–12 ppm. Stripping/elution requires separate review.
Rights & positioningProprietary VELQANIS screening logic. Intended to help customers and support technical dialogue.